Srinagar, Publish Date: Dec 17 2018 1:52AM | Updated Date: Dec 17 2018 1:52AM
Representational pic
Seeking intervention of chief engineer PDD, the residents of Mustafabad sector 2 (Lane 3) area of HMT here demanded upgradation of power transmission system in the area.
A delegation from the area said for the fifth consecutive day, power supply was affected in the area. “The worn out wires cannot bear the load and must be replaced on priority” they added.
Credit: Source link